Radius of placing boom(m):32
Tower Height (m) :8
 Packaging & Delivery
Packaging & Delivery 
Wooden box
7-30 Days
Overview
A climbing concrete placing boom mainly consists of the tower body, climbing frames, slewing mechanism, upper-lower pedestals, boom assembly, hydraulic system, electrical system, etc., and is suitable for the construction of high-rise buildings. It is fixed in the lift shafts or floor openings and climbs up by means of its climbing system or a tower crane, providing enhanced efficiency and quality of concrete placement and saving labor.
● Self-climbing type:
1). Self-climbing in the lift shafts: The placing boom climbs up along the lift shaft with the rising of the floors, with horizontal reaches of 28mand24m.
2). Self-climbing in the floor openings: The placing boom climbs up along the floor openings with the rising of the floors, with horizontal reaches of28m,24mand17m.
| Model | HGY32 | |
| Radius of placing boom | 32meter | |
| Section number | 4 | |
| Tower body type | Tubular | |
| Tower body height | 8meter | |
| Hose | φ125×3m | |
| Pipeline Diameter | φ125×4mm | |
| Mode of drive | Hydraulic | |
| Power of motor | 18 kW | |
| Pressure of hydraulic system | 31 MPa | |
| Rotation 、 Elevation angle | 360º、-4~90 º | |
| Mode of operation | 1. cable remote control 2. radio remote control | |
| Total weight | 20500kg | |
| Weight of the heaviest component | 8600 kg | |
| Wind speed | Installation status | V≤46km/h(13m/s) | 
| Working status | V≤56km/h(16m/s) | |
| Standby status | V≤72km/h(20m/s) | |
| Parked state | V≤130km/h(36m/s) | |
| working temperature | -20 ºC~+45 ºC | |
| Power | 380V/50HZ | |
 Inquiry
Inquiry